decorative banner

Submitting all design diagram items


    You can submit a design diagram for the first or only time, submit a diagram you have recalled, or submit a nonrecalled diagram to update a previous submission.When you submit a diagram, the following changes take place:

    • In the Staging tab of the diagram window, the pages move from the Design Pages group to the Live Pages group. (They also appear with a Live Page staging icon Live Page icon in the Design tab.) Custom objects move from the Design Objects group to the Live Objects group.
    • In the site window, the pages appear in the Files tab. The pages move from the diagram staging folder in the site data folder to the target folder in the root folder.
    • In the navigation view, pages that are directly or indirectly linked to an anchor page appear in the central pane in the same hierarchy that they form in the design view. Unanchored pages and custom objects appear in the scratch pane.
    • Pending links between pages are updated. The Pending Links palette can be used to resolve any problems with the links.

To submit all design diagram items:

  1. Open the diagram in a design view.
  2. Click the Submit All button Submit All button on the toolbar, choose Diagram > Staging > Submit All, or choose Submit All from the diagram window menu.